Everyone
Automated Train Operations (ATO) Sensor Platform Data Analysis Rapid Prototype
In a Federal Railroad Administration-funded Automated Train Operations (ATO) Sensor Platform (SP) Data Analysis Rapid Prototype (RP) project, a team from Transportation Technology Center, Inc. researched the feasibility of using commercial off-the-shelf (COTS) data analysis processes and tools...
Mechanistic Investigation of Timber Crosstie Spike Fastener Failures – Phase I: The Magnitude of the Spike Failure Challenge
The Rail Transportation and Engineering Center (RailTEC) at the University of Illinois at Urbana-Champaign (UIUC) performed a literature review, conducted an industry-wide survey, and arranged multiple field visits to examine and quantify the challenges North American railroads are facing with...
Project-Specific Terms and Conditions -- Attachment 2
This document contains Project-Specific Terms and Conditions, which may include special terms and conditions, and is part of the Grant Agreement between FRA and recipients of funding under FRA grant programs.
General Terms and Conditions -- Attachment 1 (Feb 2024)
This document contains the standard terms and conditions governing the administration of a Grant Agreement and the execution of a rail project that has been selected to receive funding through an FRA grant program.