All Authenticated
Railroad Operating Rules: Program of Operational Tests and Inspections; Railroad Operating Practices: Handling Equipment, Switches and Fixed Derails
Due to our recent website upgrade some of the links in legacy documents might point to the decommissioned site location. We recommend that users take advantage of the search engine above to locate the material they seek on the current website. Be assured that we are working...
Railroad Communications
The Federal Railroad Administration (FRA) amends its radio standards and procedures to promote compliance by making the regulations more flexible; to require wireless communications devices, including radios, for specified classifications of railroad operations and roadway workers; and to...Two-Way End-of-Train Telemetry Devices and Certain Passenger Train Operations
FRA is revising the regulations regarding the use and design of two-way end-of-train telemetry devices (two-way EOTs) to specifically address certain passenger train operations where multiple units of freight-type equipment, material handling cars, or express cars are part of a passenger train�s...Two-Way End-of-Train Telemetry Devices
FRA is revising the regulations governing train and locomotive power braking systems to include provisions pertaining to the use and design of two-way end-of-train telemetry devices (two-way EOTs). Twoway EOTs provide locomotive engineers with the capability of initiating an emergency brake...Brake System Safety Standards for Freight and Other Non-Passenger Trains and Equipment; End-of-Train Devices
FRA is issuing revisions to the regulations governing the power braking systems and equipment used in freight and other non-passenger railroad train operations. The revisions are designed to achieve safety by better adapting the regulations to the needs of contemporary railroad operations and...Positive Train Control Systems (RRR)
FRA amends the regulations implementing a provision of the Rail Safety Improvement Act of 2008 that requires certain passenger and freight railroads to install positive train control (PTC) systems. This final rule removes regulatory provisions that require railroads to either conduct further...Positive Train Control Systems; Final Rule Amendments
Due to our recent website upgrade some of the links in legacy documents might point to the decommissioned site location. We recommend that users take advantage of the search engine above to locate the material they seek on the current website. Be assured that we are working...