General
Acoustical Warning Devices as Emergency Warning Signals, Phase 2
The Federal Railroad Administration (FRA) sponsored a project to demonstrate the effectiveness of an Acoustical Warning Device (AWD) to be used for generating a secondary Emergency Warning Signal (EWS). The focus of this Phase 2 work is to warn trespassers of an approaching train through the...
Solid-State Welding of Signal Wire Attachment
More reliable signal wire attachments can reduce uncertainty, improve safety, and reduce operational costs. This report investigates the causes of failures at these attachments and develop an alternative signal wire-to-rail attachment process. EWI modified an earlier design of the brass stud to...
HQ-2020-1399
On October 29, 2020, at approximately 7:25 a.m., CDT, a Kansas City Southern Railway Company (KCS) northbound (timetable direction) mixed freight train (MBMSH-29), handling 95 loads, 60 empties with 4 locomotives (configured 4 x 0) at an estimated speed of 39 mph derailed 25 (15 loaded and 10...
North Rail Connector Project
Project DescriptionThe Jackson County Port Authority (JCPA) proposes to construct the North Rail Connector (the Project). The Project would connect existing rail owned by Mississippi Export Railroad (MSE) that crosses over the Escatawpa River in Moss Point, Mississippi, to existing...