Addresses the importance of having clear safety and response procedures for use in the event of reports of railroad signal system problems
Document Series:
          Safety Advisories
        Safety Advisory Number
              2004-02
          Subject:
          Signal and Train Control
        Keywords:
          Signal and Train Control; hazardous material; manually operated switch; switch points; gapped switch
        
  			
  				DOT is committed to ensuring that information is available in appropriate alternative formats to meet the requirements of persons who have a disability. If you require an alternative version of files provided on this page, please contact
  					FRADevOps@dot.gov.
  			
  		
  		
              Effective Date: Tuesday, August 10, 2004