Initial Assessment of the Technical Feasibility and Potential Cost Savings of a Lower-cost Positive Train Control Activated Crossing
Document Series:
Technical Reports
Office
RRD
Subject:
Safety Performance Measures
Keywords:
Highway-Rail Intersection (HRI), North American Joint Positive Train Control (NAJPTC), Advanced Crossing Activation Capability
DOT is committed to ensuring that information is available in appropriate alternative formats to meet the requirements of persons who have a disability. If you require an alternative version of files provided on this page, please contact
FRADevOps@dot.gov.
Last updated: Thursday, May 6, 2004