Risk Analyses for the IDOT Positive Train Control System to Determine Optimum Communications Timeout: Comparison to Cab Signal Systems with Continuous Train Stop and with Speed Control
Document Series:
Technical Reports
Author:
- Alan Bing, Ph.D.,* Eric Sherrock**
Report Number
DOT/FRA/ORD-09/21
Office
RRD
Keywords:
Positive train control, IDOT Corridor, Timeout, Latency, Risk Assessment
DOT is committed to ensuring that information is available in appropriate alternative formats to meet the requirements of persons who have a disability. If you require an alternative version of files provided on this page, please contact
FRADevOps@dot.gov.
Last updated: Sunday, November 1, 2009