USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

Technical Reports

Discrete Element Modeling of Railroad Ballast Behavior

An innovative integrated computational-experimental laboratory testing framework has been developed at the University of Illinois at Urbana-Champaign to evaluate clean and fouled ballast behavior. The railroad ballast layer consists of discrete aggregate particles and it is a critical substructure...

Positive Train Location: Final Report

The overall goal of the Positive Train Location (PTL) project is to develop a system capable of providing the onboard PTC system with timely and accurate position reports of the head-of -train (HOT) and the end-of-train (EOT) for determining track discrimination and train length without the use of...

Positive Train Control Track Data Auditing System

The Federal Railroad Administration (FRA) contracted with Transportation Technology Center, Inc. (TTCI), to develop documentation for a system which automates the auditing of railroad track data for Positive Train Control (PTC). TTCI developed a Concept of Operations (ConOps) document and...

PTC Test Bed Siding Signal Upgrade at the Transportation Technology Center

The Federal Railroad Administration (FRA) contracted Transportation Technology Corporation, Inc. (TTCI) to continue work performed from February 2013 through December 2014 to upgrade the infrastructure and testing capabilities of the Positive Train Control (PTC) Test Bed by converting the existing...

Development and Evaluation of a Moving Map Display for Rail Applications

This report describes the development and evaluation of a prototype real-time moving map display to support engineer situation awareness and safety performance for future U.S. high-speed rail applications. The development started with a hybrid Cognitive Task Analysis to develop Information and...

PTC Test Bed Upgrades to Back Office and Computer-Aided Dispatch Systems

Transportation Technology Center, Inc. (TTCI) performed work sponsored by The Federal Railroad Administration (FRA) to complete updates to the Positive Train Control (PTC) Test Bed at the Transportation Technology Center (TTC). The updates also included the PTC back office (BOS) and computer-aided...

Positive Train Control Test Bed Verification

The Federal Railroad Administration (FRA) provided support to Transportation Technology Center, Inc. (TTCI) regarding the Advanced Civil Speed Enforcement System (ACSES) and the Interoperable Train Control (ITC) system deployments on the Railroad Test Track (RTT) at the Transportation Technology...