An official website of the United States government
Official websites use .gov A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
This Environmental Assessment (EA) and Section 4(f) Evaluation for the All Aboard Florida West Palm
Beach to Miami Passenger Rail Project (Project) was prepared jointly by All Aboard Florida – Stations LLC
and All Aboard Florida – Operations LLC (AAF). FRA reviewed and commented on draft versions...
This report presents the results of an analytical study of the technical and economic feasibility of applying the track renewal
method of railroad track maintenance in the United States. Track renewal, or out-of-face renewal, has long been the prevailing
form of track maintenance used in Europe...
-This report describes a multifaceted investigation into the application
of lime slurry pressure injection (LSPI) to stabilize and improve railroad
roadbeds." - Area-s discussed include (1) the current state of lime-injection
technology, (2) soil exploration and testing related to the use of...
Thermal buckling of railroad tracks in the lateral plane is an important problem
in the design and maintenance of continuous welded rail (CWR) tracks. The work
reported here is part of a major investigation carried out by the John A. Volpe
National Transportation Systems Center for the Federal...
Tests have been conducted on Amtrak's traditional passenger seat to evaluate its performance under static and dynamic loading conditions. Quasi-static tests have been
conducted to establish the load-deflection characteristics of the seat. Dynamic tests of selected collision conditions have also...
This study is the third in a series which has reviewed the performance of concrete
and wood tie track at the Facility for Accelerated Service Testing (FAST). It presents an evaluation of both types of track through 425 million gross tons (MGT) of
service In the FAST Track at the Transportation...
Four 11-month system concept definition (SCD) studies, totaling
more than $8.6 million, were awarded in late October 1991 to
determine the technical feasibility, performance, capital,
operating and maintenance costs for a maglev system that would be
available by the year 2000. Due to the...