General
Show Effective Date
Off
PTC 220 MHz Radio: Pre Production Radio Versions 1 and 2 Wayside, Base, and Locomotive Manufacturing Test Plan
This document outlines the test strategy and testing required for the PP1/PP2 ITC Wayside Radio, Base Radio, and the Locomotive Radio at the Contract Manufacturers (CM). The testing is based on demonstrating that each product shipped from the CM is properly configured and calibrated, meets product...PTC 220 MHz Radio: Release 1.0 Integration Testing Test Report
The MCC PTC communication system contains three primary subsystems: 220 MHz radios, Messaging software, and Systems Management software. Integration testing of the communication system refers to a process under which two or more of these subsystems are combined together and tested. This document...Impacts of Participatory Safety Rules Revision in U.S. Railroad Industry
Increasingly, the proliferation of safety rules is viewed not just as a nuisance but also as a threat to safety itself. Indeed, voluminous and overlapping rules might contribute to poor compliance because of confusion and disagreement about which rules are to be followed. When combined with the...