FY19 Federal-State Partnership for State of Good Repair Grants NOFO Webinar
ABSTRACT: The Federal Railroad Administration hosted a webinar about the FY19 Federal-State Partnership for State of Good Repair Grants NOFO on October 31, 2019.
ABSTRACT: The Federal Railroad Administration hosted a webinar about the FY19 Federal-State Partnership for State of Good Repair Grants NOFO on October 31, 2019.
KEYWORDS: Long Bridge Project Fact Sheet, LBP
KEYWORDS: Washington Union Station Expansion Project, WUS, Fact Sheet
PRESS RELEASE NUMBER: News Digest CONTACT: FRA Public Affairs PHONE: 202-493-6024 SUBJECT: Positive Train Control KEYWORDS: PTC, Positive Train Control
Due to multiple inquiries, we are providing the following background information:
As of...
PRESS RELEASE NUMBER: 03-18 CONTACT: FRA Public Affairs PHONE: (202) 493-6024 SUBJECT: Positive Train Control, Grants & Financial Assistance KEYWORDS: PTC, NOFO, CRISI ABSTRACT: The Federal Railroad Administration (FRA) today announced that it is hosting a...
PRESS RELEASE NUMBER: FRA 02-19 CONTACT: FRA Public Affairs PHONE: (202) 493-6024 SUBJECT: Freight Operations, Passenger Rail, Positive Train Control, Accident Reduction, Testing KEYWORDS: Positive Train Control, Safety, Interoperability, Host Railroads, Tenant...
PRESS RELEASE NUMBER: PHMSA 08-19 CONTACT: Randon Lane PHONE: (202) 366-4831 SUBJECT: Emergency Preparedness, Hazardous Materials KEYWORDS: LNG, hazardous materials, tank cars ABSTRACT: The U.S. Department of Transportation’s Pipeline and Hazardous Materials...
PRESS RELEASE NUMBER: FRA 12-19 CONTACT: FRA Public Affairs PHONE: (202) 493-6024 SUBJECT: Passenger Rail KEYWORDS: NOFO, Restoration and Enhancement Grants Program, FAST Act, Federal Register ABSTRACT: WASHINGTON – The U.S. Department of Transportation’s...
SPEAKER: Heath Hall AUDIENCE: LOCATION: St. Louis, MO SUBJECT: Highway-Rail Grade Crossing Warning Systems, Highway-Rail Grade Crossings, Trespasser Programs, Accident Reduction KEYWORDS: Grade-Crossing; Accident Prevention
In order to appropriately process submissions, meetings must be requested at least 60 days in advance.