USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

General

Track Structure Design Using Mathematical Models

The objective of the report is to demonstrate the use of mathematical track structure models in the development of design charts. The f110dels have been developed in Task 1, Mathematical Modeling, of the Track Structures Research Program, Contract DOT-FR-30038. The charts should enable the optimal...

The Kansas Test Track Part II- Appendices

This report presents data obtained from an experimental project to compare the performance of different track support systems. Also, it describes instruments used for data measurement, their location in track, and test procedures. Analysis and evaluation of test data are presented in Part I of...

The Kansas Test Track

The Federal Railroad Administration and the Atchison, Topeka, & Santa Fe Railway Company are jointly sponsoring the construction of a test track as part of the railroad's heavy tonnage main line in Kansas. The objective of the project is a determination of the levels of increased train...

The Energy and Environmental Impact of Railroad Electrification

This report describes the potential effects of railroad electrification for high traffic density lines in the United States. Two high traffic density groupings of routes are identified as candidates for electrification. The primary group consists of eleven highly utilized routes with traffic...

The Effects of Accelerated Ballast Consolidation

The effects of accelerated ballast consolidation were tested on mainline tracks of the Boston and Maine, the Chessie, the Missouri Pacific, the Penn Central and the Saint Louis and Southwestern, and at three sites on the Southern. Tests were made before and after traffic, after surfacing and...

Test Train Program- Ninth Progress Report

This report describes progress on the Engineering and Test Support Services for Railroad Instrumentation, Data Acquisition, Processing and Evaluation Program from 1 July 1976 through 30 June 1977. The report covers operation of the FRA track geometry measurement and data acquisition fleet, track...