Very Long Trains – Phase II - Rack Tests
In Phase II of this research project, FRA sponsored Wabtec to perform train air brake tests on long trains at their facility in Wilmerding, Pennsylvania, between January 2021 and March 2021. The air brake rack simulated trains with up to 200 control valves using a conventional (i.e., head-end...