This report represents the progress towards implementing PTC for the year 2015 on Sound Transit.
In the year 2015 Sound Transit completed following milestones:
1. Sound Transit contracted Xorail to install On-board PTC hardware on the Sound Transit Locomotives, Cab Cars and designated Tacoma Rail...
Most of the RTD Eagle Project PTC equipment was installed in year 2015, followed by field testing, and starting of integration testing for the East Corridor line segment – the first segment to be open for service in 2016.
This report represents the progress towards achieving the goals for the year 2015 as outlined in the PNWR PTCIP (Revision 1.9 – submitted to the FRA on 01/18/16); specifically the high-level schedule shown in Section 7, Deployment Sequence and Schedule, of the PTCIP and Appendix 15.1, Project...
The PCMZ and its System Integrator, Parsons Transportation Group have completed the construction phase of the project and have entered into the testing phase. Testing is being performed at multiple levels including lab, hi-rail and dynamic test train. We are actively engaged with FRA for approvals...
Consistent with the requirements prescribed in Subpart I, NICTD has developed and provided its intended sequencing for implementing Positive Train Control in an efficient and logical manner. The sequencing of activities was developed in consideration of design, installation, validation and testing...
As a result of the extension of the PTC implementation date and release of the revised PTCIP required by the change in the law, there is no valid PTCIP 2015 Year End Goal for this annual report. 2015 highlights of Metra’s PTC program include:
GENERAL Monthly stakeholder and interoperability meetings were held in 2015 as were quarterly CalTrans meetings. NCTD attended LA
Regional meetings in 2015 until they were discontinued in the latter half of the year. In August 2015 the FRA held a Site Monitoring Visit in
Oceanside and an...
Norfolk Southern Railway Company (“NSR”) provides its progress report documenting progress
toward achieving its planned PTC Implementation. This report is submitted in accordance with
49 U.S.C. 20157(c)(1) and utilizes the structure of Form FRA F 6180.166 (“Form”) for content.
The New Mexico Department of Transportation (NMDOT), owner of the NMRX Railroad system, commenced negotiations with PTC 220 LLC on a PTC spectrum lease agreement for testing and for operation after having executed a confidentiality agreement with PTC 220 LLC in late 2014. NMDOT has also worked with...