News Archive
- May 22, 2020
- May 21, 2020
From June 2015 to January 2018, the Federal Railroad Administration (FRA) contracted Transportation Technology Center, Inc. (TTCI) to perform a 3-year study to develop guidelines for the implementation of Ground Penetrating Radar (GPR) technology by...
- May 21, 2020
Transportation Technology Center, Inc. (TTCI) developed initial concepts for a Positive Train Control (PTC) Interoperable Lifecycle Management (ILM) system to support established and evolving industry processes to manage, coordinate, and document...
- May 21, 2020This page contains a summary of recent updates to the website.
- May 19, 2020
FRA prepared the Concept Screening Report as part of the development of an Environmental Impact Statement (EIS) in compliance with:
- National Environmental Policy Act (NEPA) of 1969 (42 United States Code [USC] § 321 et seq.);
- ...
- May 19, 2020
FRA held the Public Scoping Meeting on December 7, 2015, in the Washington Union Station Presidential Room. The meeting provided project information, input on the purpose and need of the Project, concepts for alternatives that may be considered in the...
- May 19, 2020
Information Forum Summary
Meeting Overview
On Wednesday, March 30, 2016, the Federal Railroad Administration (FRA) hosted an Informational Forum to provide the public with an opportunity to learn more about the Washington...
- May 19, 2020
FRA hosted the Washington Union Station Expansion Project’s fourth Public Meeting on March 22, 2018 from 4:00 p.m. to 8:00 p.m. in Washington Union Station’s Presidential Room located in the East Hall. An informal open house format was conducted...
- May 18, 2020
- May 18, 2020