USA Banner

Official US Government Icon

Official websites use .gov
A .gov website belongs to an official government organization in the United States.

Secure Site Icon

Secure .gov websites use HTTPS
A lock ( ) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.

U.S. Department of Transportation U.S. Department of Transportation Icon United States Department of Transportation United States Department of Transportation

Technical Reports

Track Geometry Survey Device for LIM Research Vehicle Test Track

A track survey device was designed, built and operated to measure the geometry of the FRA Linear Induction Motor Test Track at Pueblo, Colorado. A laser beam is used for the measurement of profile and alignment; an electronic level for the measurement of superrelation and mechanical sensors for...

Railroad Research Bulletin: Autumn 1973

This publication contains 1,297 abstracts of journal articles and research reports selected by RRIS from current railroad literature and 150 summaries of ongoing research activities in the railroad field. The material covers the entire range of railroading from technology to management,...

MBTA Green Line Tests: Riverside Line, December 1972

The UMTA sponsored Urban Rail Supporting Technology Program emphasizes three major task areas; facilities development, technology development, and test program development. The test program development is composed of three sub-areas: vehicle testing, ways and structures testing, and track...

Detail Specification for State-of-the-Art Car

This document is the detail specification for the State-of-the-Art Car (SOAC). This specification represents the SOAC configuration as delivered to the Urban Mass Transportation Administration (UMTA) for test and demonstration. The SOAC has been developed under UMTA's Urban Rapid Rail Vehicles...

Cost-Effectiveness Review of Railroad Electrification

A comparison was made between the costs of electric and diesel-electric motive power to haul traffic projected for the 1975-2005 time period over a hypothetical network of high density mainline routes carrying about 50 percent of the 1975 traffic. The routes were selected from the Federal...