PTC Annual Report for 2015: Terminal Railroad Association of St. Louis

TRRA is still in negotiations for a contract for providing and installing PTC on its territory and locomotives. Discussions involve the potential Contractor and Union Pacific Railroad in addition to TRRA and its engineering consultant, Burns Engineering, Inc. No equipment has been furnished or...

PTC Annual Report for 2015: Southern California Regional Rail Authority

SCRRA has achieved system‐wide RSD as of June 30, 2015 and has submitted a PTCSP December 30, 2015. Since beginning RSD in March of 2015, SCRRA has over 30,000 successful PTC trips. SCRRA seeks concurrence that it has fully implemented PTC per its PTCIP prior to December 31, 2015 and further...

PTC Annual Report for 2015: Sounder Commuter Rail

This report represents the progress towards implementing PTC for the year 2015 on Sound Transit. In the year 2015 Sound Transit completed following milestones: 1. Sound Transit contracted Xorail to install On-board PTC hardware on the Sound Transit Locomotives, Cab Cars and designated Tacoma Rail...

PTC Annual Report for 2015: Portland & Western Railroad

This report represents the progress towards achieving the goals for the year 2015 as outlined in the PNWR PTCIP (Revision 1.9 – submitted to the FRA on 01/18/16); specifically the high-level schedule shown in Section 7, Deployment Sequence and Schedule, of the PTCIP and Appendix 15.1, Project...

PTC Annual Report for 2015: Peninsula Corridor Joint Powers Board

The PCMZ and its System Integrator, Parsons Transportation Group have completed the construction phase of the project and have entered into the testing phase. Testing is being performed at multiple levels including lab, hi-rail and dynamic test train. We are actively engaged with FRA for approvals...