In Automatic Speed Control (ASC) territory, LIRR’s PTC system consists of Cab Signaling with ATC and ACSES II. IN non-ASC signaled territories, LIRR’s PTC system consists of wayside ABS signaling and ACSES II.
For 2015, LIRR accomplished the following high level elements towards PTC compliance...
As required by RSIA08 and the Surface Transportation Extension Act of 2015 (STEA 2015), KCT submits the following annual report describing its progress towards fulfilling the goals outlined in its PTC Implementation Plan (PTCIP):
This annual report is to be submitted to the Federal Railroad...
KCSR’s progress with respect to Positive Train Control (“PTC”) in 2015 was orchestrated via a Program governance regime which sees a formal
PTC Program executed in four phases: Mobilize, Develop, Deploy, and Sustain.
Mobilize – Introduction of the Program: Initial assignment of resources,...
In February 2016 DCTA submitted updated PTCIP (Rev 5) with accompanying RFA to propose change of the implemented system from the originally proposed V-ETMS by Wabtec, to Alstom’s E-ATC system. DCTA will utilize the Type Approval of Enhanced Automatic Train Control (E-ATC), FRA Type Approval (FRA-TA...
Pursuant to 49 USC 20157(c)(1)1 and 49 CFR §236.1009(a)(5)2 of the Positive Train Control Systems; Final Rule as amended (Final Rule), CSX Transportation, Inc. (CSXT) submits this annual progress report to the Federal Railroad Administration (FRA) in regard to the revised CSXT Positive Train...
Conrail Shared Assets has completed the installation and in-service of the PTC field equipment. All WIUs are currently reporting signal status to the WSRS. The WSRS is in service and operating. There are currently 5 operational base stations in PTC service under a temporary license through the LLC...
In early to mid-2015, CFRC was exploring implementing E-ATC for PTC since E-ATC was being implemented by other commuter rail systems. An open design-build procurement for both E-ATC and I-ETMS was issued in September 2015 but was cancelled because E-ATC was no longer a viable option. Discussions...
CMTY has secured Mott MacDonald to act as the PTC Engineer through a 2014
procurement. CMTY will issue a RFP and award a contract for provision and installation of an
E-ATC system in 2016, as described in Version 2.6 of its PTCIP.
During CY2015, CP has made significant progress toward Revenue Service Demonstration in the Ottumwa subdivision, as well as wayside build out in other subdivisions and equipping Locomotives for PTC use.